Reports & Studies

South Street Improvements in South Hero

A two-year planning process completed in 2004 determined that 3-foot shoulders should be added to South Street in order to make it safe for bicyclists and pedestrians. South Street is the connection between the causeway and the village center. The voters approved the local match for a scaled down project in 2009.  The revised design will have the section of South Street between Martin Road and Landon Road rebuilt with two foot shoulders. For more info, contact South Hero Administrative Officer This email address is being protected from spambots. You need JavaScript enabled to view it. .

South Hero Village to Allen Point Access Linkage Feasibility and Alignment Study - June 2004

The Feasibility and Alignment study for South Street is available to download. Right Click or Control Click a link below to download the full report or text only.

Text Only (3.09 MB)

Full Report (19.2 MB)

 

Interested in receiving bicycle guide maps for the Lake Champlain Region?

Click here for more info.

Sign up for

Walk n' Roll News


Email:

 

Local Motion · 1 Steele St. #103 · Burlington · VT 05401 · (802) 861-2700 · Contact Us
© 2008 - 2016 Local Motion | Designed by: VSD Consulting

facebook_icon twitter_icon